Environment
SubNavigation
Reclamation & Restoration
Collier Resources strives to maintain a small environmental footprint during production and completely erases it when production is complete. A wellhead the size of a large fire hydrant and an electric generator are all the equipment that typically remain on the site once a well is established. Once production is complete, an average of 12-15 years for one well, the site is restored as closely as possible to its original condition.

The restoration process includes:
  • Removing all equipment and the limestone pad.
  • Returning and contouring the original topsoil.
  • Replanting native vegetation.
  • Restoring original water flow.
  • Continuous monitoring to ensure success.
Well Pad After Restoration
Well Pad Before Restoration